Overblog Follow this blog
Administration Create my blog

Spudded in November 2015, Cairn Energy PLC’s SNE-2 appraisal well was successfully tested in two intervals offshore Senegal on the Sangomar Block (OGJ Online, Dec. 10, 2015). Drillstem tests over a 12-m interval flowed 8,000 bo/d through a 24/64-in. choke,...

Read more
Tag(s) : #Oil and Gas News

The overall US drilling rig count fell 2 units to 698 during the shortened holiday week ended Dec. 31. The total is down 1,113 rigs from the same week a year ago, according to Baker Hughes Inc. data. The overall US drilling rig count fell 2 units to 698...

Read more
Tag(s) : #Oil and Gas News

General Electric Co. has been awarded a nearly $1 billion contract to build a combined cycle power plant for the Saudi Electric Co., with much of the equipment to be manufactured in Schenectady ... Schenectady General Electric Co. has been awarded a nearly...

Read more
Tag(s) : #Contract Awards News
--> Flag Counter